Aerial view of ELEV8 high-reach demolition at the Tyson Feed MillVerified ELEV8 project media

Project proof

Evidence buyers can sort by the work they need done.

Thirteen ELEV8 project records show the range of commercial, industrial, interior, specialty, and emergency work — sortable by the scope buyers need to verify.

Certified General ContractorFlorida CGC1528313Current · ActiveVerify license ↗

Project record

Every project, with the proof behind it.

01Tyson Feed MillIndustrial structure removal
Aerial view of ELEV8 high-reach demolition at the Tyson Feed Mill
Project context
Operating feed mill — silo and mill structure removed with high-reach equipment while the rest of the plant kept running
Primary scope
Structural / Industrial
Field record
High-reach takedown of the concrete silos and mill structure inside an operating industrial facility, sequenced so production around the work continued and the remaining structure was left intact.
Proof source
Verified ELEV8 project photography
02MOSH MuseumInstitutional redevelopment
ELEV8 excavators performing structural demolition at MOSH in Jacksonville
Project context
Closed four-story Museum of Science & History on the Downtown Southbank, 83,299 sq ft — structure and foundation — 2026
Primary scope
Structural / Heavy Concrete
Field record
Controlled structural work in a constrained urban setting.
Proof source
Verified ELEV8 project photography · Jacksonville Daily Record · Jacksonville Daily Record
03N5 Garage DemoAdaptive-reuse enabling work
Project context
Multi-storey parking garage at 721 N Pearl St, downtown Jacksonville, being opened up for adaptive reuse — 2025–2026
Primary scope
Selective / Heavy Concrete
Field record
Selective structural demolition on a downtown street: precast double-tees lifted out by crane, remote-controlled Brokk work at night inside the structure, dust suppression at the sidewalk, and the concrete routed to recycling.
Proof source
Verified ELEV8 project photography
04Prominence Building 300Commercial redevelopment
ELEV8 excavator working inside the partially demolished Prominence Building 300
Project context
Occupied office campus — structural and selective removal at Building 300 while the neighbouring buildings stayed open — 2025
Primary scope
Structural / Selective
Field record
Interior and structural removal sequenced around an occupied campus: work hours, haul routes, and dust control planned so tenants next door kept operating.
Proof source
Verified ELEV8 project photography
05Adventure LandingLarge-site redevelopment
ELEV8 excavators taking down water-park buildings at Adventure Landing, Jacksonville, with the park sign in frame
Project context
Former Adventure Landing water park, Beach Blvd, Jacksonville Beach — phased removal of slides, buildings, and site — 2026
Primary scope
Structural / Heavy Concrete
Field record
Phased demolition of the park: slide structures taken down and salvaged first, then the buildings and site features, with the adjacent road and neighbouring businesses kept clear throughout.
Proof source
Verified ELEV8 project photography
06RISE DoroEmergency stabilization & takedown
Project context
Fire-damaged, partially collapsed apartment high-rise still under construction, next to VyStar Veterans Memorial Arena in downtown Jacksonville — January 2024
Primary scope
Emergency / Commercial / Structural
Field record
Emergency stabilization support and controlled high-reach demolition of the fire-damaged structure and its collapsed wing under the engineer's sequence.
Proof source
Verified ELEV8 project photography · Demolition & Recycling International · The Florida Times-Union
07Ford Model T PlantHistoric industrial plant demolition
Project context
Historic 1924 Ford assembly plant at 1900 Wambolt St on the St. Johns River — roughly 165,000 sq ft of heavy industrial structure cleared for redevelopment — 2023
Primary scope
Industrial / Commercial / Structural
Field record
Full structural demolition of a riverfront manufacturing plant: reinforced concrete frame, floors, and foundations taken down under a city demolition permit, with the steel recovered and the concrete crushed and routed to recycling, and the site handed over clear for the owner's next phase.
Proof source
Verified ELEV8 project photography · Jacksonville Daily Record · Jacksonville Daily Record · Ford Authority
08River City BrewingRiverfront restaurant demolition
Aerial view of ELEV8 excavators demolishing the former River City Brewing Company building on the Southbank riverfront in Jacksonville
Project context
Former River City Brewing Company restaurant at 835 Museum Circle on the Downtown Southbank, cleared for the Related Group's riverfront residential tower — 2022
Primary scope
Commercial / Structural
Field record
Demolition of the restaurant structure and full site clearance on a working riverfront, next door to MOSH and the public riverwalk, with the site delivered clean to the developer for the tower that followed.
Proof source
Verified ELEV8 project photography · The Florida Times-Union · Jacksonville Daily Record
09JU Water TankSequenced elevated water tank takedowns
ELEV8 crew performing the controlled takedown of one of two Jacksonville University elevated water tanks and its tower
Project context
Jacksonville University campus, Arlington — two elevated water tanks and their steel towers taken down in sequence on an active campus
Primary scope
Specialty
Field record
Sequenced takedown driven by the university's requirement to keep one tank in service at all times: the first tank and tower came down, the university brought its replacement online, then the second came down. Exclusion zones held around each takedown and campus access maintained throughout, coordinated with university operations.
Proof source
Verified ELEV8 project photography
10Gateway Mall interiorInterior & escalator demolition
ELEV8 excavator working in the truss to remove an escalator inside Gateway Town Center, Jacksonville
Project context
Gateway Town Center, 5200 Norwood Ave — phased interior and selective demolition across an occupied retail center for The Bannett Group — 2024–2026
Primary scope
Interior / Selective
Field record
Escalator and interior demolition inside an occupied retail structure, run in phases as spaces turned over: Phase 1, the Rainbow building, Building C with asbestos abatement coordinated ahead of the work, the second-floor former JCPenney, and a further phase now under way, with the center trading throughout.
Proof source
Verified ELEV8 project photography
11Ambassador HotelRobotic selective demolition in a historic landmark
Project context
1924 downtown Jacksonville landmark (National Register since 1983), long vacant, mid historic renovation for a prior owner — 2022. The basement was opened for a wine cellar while the building above stayed intact.
Primary scope
Interior / Selective / Heavy Concrete
Field record
Selective interior demolition including removal of a heavily reinforced concrete bridge structure in the basement with a remote-controlled Brokk. No room for an excavator and no tolerance for vibration in a historic structure: the operator worked clear of the swing and the dust, and the processed concrete was carried out through the building.
12Morocco Shrine CenterStructural demolition for redevelopment

Documented job — photo not published

Project context
Former Morocco Shrine Center, 3800 St. Johns Bluff Rd near UNF — roughly 115,000 sq ft event center taken down for redevelopment for The Klotz Group — 2023
Primary scope
Commercial / Structural
Field record
Full structural demolition of the auditorium and event halls, slab and foundations removed, concrete and steel sorted for recycling, sequenced to clear the site for the developer's next phase.
Proof source
Field documentation · Jacksonville Daily Record · The Florida Times-Union
13Greenleaf BuildingHistoric interior gut for a repeat GC

Documented job — photo not published

Project context
Historic Greenleaf Building, downtown Jacksonville — roughly nine floors of full interior demolition for the building's renovation, as subcontractor to Avant Construction Group — 2024–2025
Primary scope
Interior / Selective
Field record
Floor-by-floor interior gut inside an occupied downtown block: partitions, ceilings, and finishes taken back to the structure while the historic shell stayed protected and the debris was routed out through the building over roughly two years of phased work. One of a dozen scopes ELEV8 has run for the same general contractor.

Proof standard

Every project record follows the same structure.

  1. ScopeWhat ELEV8 was responsible for.
  2. ConstraintsWhat made the project demanding.
  3. ExecutionHow the field plan addressed those conditions.
  4. OutcomeWhat was handed back for the next phase.